Drinking Water Supply Projects

Sl No. Project Name Project Info Location Client Name TOTAL AREA Project Cost

1

Installation of Dual Solar Pump Piped Water Supply scheme

Feasibility study for installation of Dual Solar Pump Piped Water Supply scheme

Purulia

WB GOVT.

-----

Rs. 6,75,500.00

2

installation of Dual Solar Pump Piped Water Supply scheme

Feasibility study for installation of Dual Solar Pump Piped Water Supply scheme

Bandwan, Manbazar

WB GOVT.

-----

Rs. 5,79,000.00

3

Detailed Project Report (DPR) of Piped Drinking Water Supply

Empanelment of Consultancy Firms/Agencies for Preparation of Detailed Project Report (DPR) of Piped Drinking Water Supply Schemes in Rural Areas of Odisha (Category C)

Bhubaneswar, Odisha

Government Of Odisha

----- -----

4

Drinking water supply from Neorakhola to Thokchu

Completion Certificate of Preparation of Detailed Project Report for proposed Drinking water supply from Neorakhola to Thokchu and Kalimpong town.

Kalimpong

GTA

----- -----

5

Schemes under JJM under Dhemaji PHE division,Assam

Work order for preparation of DPR for 303 nos. new schemes under JJM under Dhemaji phe division,Assam

Dhemaji

Government Of Assam

----- -----

6

Functional House Hold Connection under Purulia Division P.H.E. Dte.

Preparation of D.P.R (Consultancy work) in connection with the Functional House Hold Connection of different existing PWSS to be Augmentation Rejuvination under Purulia Division P.H.E. Dte.

Bandwan

WB GOVT.

----- -----

7

Network design of Tilsin Water Supply Scheme

Acceptance cum formal work order for Route survey for distribution network design for augmentation of Tilsin Water Supply Scheme

Habibpur, Malda

WB GOVT.

----- -----