PMC & Execution Projects

Sl No. Project Name Project Info Location Client Name TOTAL AREA Project Cost

1

MIRIK LAKE DRAINAGE AND SEWERAGE SCHEME

Integrated drainage and sewerage system design. Mirik has an average elevation of 1,495 m (4,905 ft). The stormwater drainage system is designed for a rainfall intensity of 2600 to 4000 mm / annum and in conformity with the guidelines of the CPHEEO

Mirik Town , Darjeeling

-----

246.6 acre

37 crore