Sl No. | Project Name | Project Info | Location | Client Name | Length of Road | Project Cost |
---|---|---|---|---|---|---|
1 |
Survey along and design road of Haflong |
Survey investigation along with road design for strengthening, widening, and preparation of DPR including sub soil investigation for Double lanning of Haflong |
Haflong , Assam | Govt. of Assam | 107.00 KM |
Rs. 662,01,50,770.00 |
2 |
Design of RCO bridge at Demkujhora Thapa Busty |
Preparation of DPR for surveying planning designing drawing etc for the construction of RCO bridge over river Kumial including approach road on both the sides at Demkujhora Thapa Busty under Mal Block |
Mal, Jalpaiguri | JDA | ----- | Rs. 6,74,989.00 |
3 |
Survey with road design for strengthening, widening |
Survey investigation along with road design for strengthening, widening and preparation of DPR including sub soil investigation for Intermediate lane of D.K. |
Haflong | Govt. Of Assam | 30.00 KM |
Rs. 210,09,69,557.00 |
4 |
Topographical survey at Bongaon Sub-Division |
Topographical survey showing existing structure & approach Road and feature of Bongaon Paddy Godown and others Godown under Bongaon Sub-Division |
Barasat | WB GOVT. | ----- | ----- |
5 |
Preparation of Project Report for the Roads |
Feasibility Study Detail Contour Survey, Selection of Alignment and Preparation of Project Report and Cost Estimate for the Roads as given in the BOQ and tender notice in the State of Mizoram – Package – III. |
Mizoram | Government of Mizoram | ----- | Rs- 77,70,000.00/- |
6 |
Preparation of DPR the work Durgapur-Patnoliaghar Road |
Preparation of Detailed project report the work “Durgapur- Patnoliaghar Road |
Durgapur | WB GOVT. | ----- | ----- |
7 |
DPR for strengthing work of Rajarhat-Mathabhanga |
Detailed survey and detailed project report for strengthing work of rajarhat to mathabhanga Road from 3.40 kmp to 14.00 kmp under Coochbehar Highway Division, P.W.(Roads) Dte. Including preparation of PPT of DPR |
Coochbehehar, West Bengal | WB GOVT. | ----- | Rs-2,65,000.00/- |
8 |
DPR for Rural Road Under PMGSY-III Tripura |
Preparation of DPR for Rural Road Projects Under PMGSY-III Tripura |
Agartala, Tripura | Government of Tripura | ----- | ----- |
9 |
DPR of various categories of road of Uttar Dinajpur |
Consultancy service for preparation of DPR for various categories of road in the district of Uttar Dinajpur under Uttar Dinajpur Highway Division, P.W. (Roads) Dte (1) Voishbhita – Soldighi road from 0.00 kmp to 10.00 kmp (2) Kanki – Goagaon road from 20.00 kmp to 27.00 kmp (3) Solpara Rasakhowa road from 30.00 kmp to 44.00 kmp (4) Ramganj – Daspara road from 0.00 kmp to 18.20 kmp |
Uttar Dinajpur | WB GOVT. | ----- | Rs-11,32,478.00/- |
10 |
DPR for Changrabandha-Jamaldah-Mathabhanga Road |
Acceptance cum work order for the work “Detailed survey & preparation of detailed project report for widening & strengthening work of Changrabandha-Jamaldah-Mathabhanga Road(SH-16) from 34.00 kmp to 50.00 kmp & 18.00 kmp to 34.00 kmp including preparation of PPT of DPR |
Cooch Behar | WB GOVT. | ----- | ----- |
11 |
DPR of Widening & Strengthening of Kharagpur – Keshiary Road |
Preparation of Detailed Project Report and allied works (as per annex schedule) for Widening & Strengthening of Kharagpur – Keshiary Road (SH-S) from 0.00 Kmp to 27.00 Kmp. & IIT Bye-pass Road from 0.00 Kmp. to 3.92 Km., length 28.09 KM |
Paschim Medinipur | WB GOVT. | ----- | Rs- 4,43,999.00/- |
12 |
DPR for Strengthening of Tentulia – Maslandapur Road |
Preparation of Detailed Project report for Strengthening of Tentulia – Maslandapur Road from 0.00 kmp to 8.00 kmp |
Barasat Division | WB GOVT. | 8.00 km |
----- |
Copyright © Radiant Engineering All rights reserved