Transportation development

Transportation development

Transportation development - Welcomed and every pain avoided. But in certain circumstances and owing to the claims of duty obligations of business it will frequently occur that pleasures have to be repudiated & annoyances that accepted. That is a wise man therefore always holds indignation and dislikes men who are so beguiled. Certain circumstances and owing to the claims of duty obligations of business it will frequently occurs all that pleasures have to be repudiated & annoyances that accepted.

High Value

Modern Interior

5 Star

Skilled Person

Additional Information

MASTER PLANNING

Our technical expertise and proven ability to manage complex groups involved ; including planning, zoning, financial entities, civic organizations, and Local government allows us to seamlessly address the constraints and focus on the unique challenges of each city, shifting the community dialogue to what that district, city or campus can become. Understanding these technicalities gives us the freedom of creativity.

STRUCTURAL DESIGN

Our structural engineers review a structure's design to determine that it will hold up to gravity, wind and other forces. We ensure that the materials used to construct the building will support its weight. We work with an architect to ensure the soundness of a structure, weather it is a home, a highrise or a bridge.

MEP DESIGN

Radiant also works alongside industry leading architects and engineers in providing traditional mechanical, electrical and plumbing engineering services for new and renovated facilities. Our firm is involved in a wide spectrum of standard and specialize MEP systems design for administrative, information technology, educational instututional, govermental and industrial projects. We offer an array of design and construction-related services for new facilities as well as provide expansion, renovation and refurbishment of exciting facilities.

FIREFIGHTING SERVICES

Our experts provide advice and expertise to both architects and building control at all stages of project design and implementation including regulations compliance, fire Modelling , Computational Fluid Dynamics (CFD) and risk assessments, Fire protection measures - active and passive, structural fire precautions, Materials performance, Fire detection and suppression, Heat transfer to the structure, Smoke movement and toxicity and smoke and heat exhaust ventilation systems.

Sl No. Project Name Project Info Location Client Name Length Of The Bridge /
Span Of Bridge
Project Cost

1

Survey along and design road of Haflong

Survey investigation along with road design for strengthening, widening, and preparation of DPR including sub soil investigation for Double lanning of Haflong

Haflong , Assam

Govt. of Assam

107.00 KM

Rs. 662,01,50,770.00

2

Design of RCO bridge at Demkujhora Thapa Busty

Preparation of DPR for surveying planning designing drawing etc for the construction of RCO bridge over river Kumial including approach road on both the sides at Demkujhora Thapa Busty under Mal Block

Mal, Jalpaiguri

JDA

Rs. 6,74,989.00

3

DPR for Construction of Composite-RCC Bridge

Preparation of Detailed Project Report -DPR-for-Construction of Composite-RCC Bridge

Mathabhanga-II, Cooch Behar

WB GOVT.

25.0mx 6

Rs. 18,21,38,907

4

Nathanial Murmu setu approach of Balurghat

Preparation of Detailed Project Report (DPR) for the work of “Nathanial Murmu setu approach of Balurghat end at 4th Km of Vikahar Amtolighat Road both side Embankment Protection work

Dakshin Dinajpur

WB GOVT.

Rs. 4,90,000.00/-

5

Widening of minor bridge or culvert

Preparation of Detailed Project Report (DPR) for the work of “Widening of minor bridge or culvert

Jalpaiguri

WB GOVT.

rs. 3,54,000.00

6

Survey with road design for strengthening, widening

Survey investigation along with road design for strengthening, widening and preparation of DPR including sub soil investigation for Intermediate lane of D.K.

Haflong

Govt. Of Assam

30.00 KM

Rs. 210,09,69,557.00

7

Topographical survey at Bongaon Sub-Division

Topographical survey showing existing structure & approach Road and feature of Bongaon Paddy Godown and others Godown under Bongaon Sub-Division

Barasat

WB GOVT.

8

Preparation of Project Report for the Roads

Feasibility Study Detail Contour Survey, Selection of Alignment and Preparation of Project Report and Cost Estimate for the Roads as given in the BOQ and tender notice in the State of Mizoram – Package – III.

Mizoram

Government of Mizoram

Rs- 77,70,000.00/-

9

Preparation of DPR the work Durgapur-Patnoliaghar Road

Preparation of Detailed project report the work “Durgapur- Patnoliaghar Road

Durgapur

WB GOVT.

10

DPR for strengthing work of Rajarhat-Mathabhanga

Detailed survey and detailed project report for strengthing work of rajarhat to mathabhanga Road from 3.40 kmp to 14.00 kmp under Coochbehar Highway Division, P.W.(Roads) Dte. Including preparation of PPT of DPR

Coochbehehar, West Bengal

WB GOVT.

Rs-2,65,000.00/-

11

DPR for Rural Road Under PMGSY-III Tripura

Preparation of DPR for Rural Road Projects Under PMGSY-III Tripura

Agartala, Tripura

Government of Tripura

12

DPR for Construction of Composite-RCC Bridge

Preparation of DPR for Construction of Composite Bridge over river Karala

Jalpaiguri,WestBengal

WB GOVT.

54.830m

Rs-8,66,78,532/-

13

DPR of various categories of road of Uttar Dinajpur

Consultancy service for preparation of DPR for various categories of road in the district of Uttar Dinajpur under Uttar Dinajpur Highway Division, P.W. (Roads) Dte (1) Voishbhita – Soldighi road from 0.00 kmp to 10.00 kmp (2) Kanki – Goagaon road from 20.00 kmp to 27.00 kmp (3) Solpara Rasakhowa road from 30.00 kmp to 44.00 kmp (4) Ramganj – Daspara road from 0.00 kmp to 18.20 kmp

Uttar Dinajpur

WB GOVT.

Rs-11,32,478.00/-

14

DPR for Changrabandha-Jamaldah-Mathabhanga Road

Acceptance cum work order for the work “Detailed survey & preparation of detailed project report for widening & strengthening work of Changrabandha-Jamaldah-Mathabhanga Road(SH-16) from 34.00 kmp to 50.00 kmp & 18.00 kmp to 34.00 kmp including preparation of PPT of DPR

Cooch Behar

WB GOVT.

15

Construction of UNI Bridge over Panchnat River

Construction of UNI Bridge over Panchnat River

Sukna Salhari, Siliguri

WB GOVT.

Rs-3,00,000/-

16

DPR of Widening & Strengthening of Kharagpur – Keshiary Road

Preparation of Detailed Project Report and allied works (as per annex schedule) for Widening & Strengthening of Kharagpur – Keshiary Road (SH-S) from 0.00 Kmp to 27.00 Kmp. & IIT Bye-pass Road from 0.00 Kmp. to 3.92 Km., length 28.09 KM

Paschim Medinipur

WB GOVT.

Rs- 4,43,999.00/-

17

DPR for Strengthening of Tentulia – Maslandapur Road

Preparation of Detailed Project report for Strengthening of Tentulia – Maslandapur Road from 0.00 kmp to 8.00 kmp

Barasat Division

WB GOVT.

8.00 km